LAND AT HIGHER STOCKBRIDGE FARM

Public Consultation

 

INTRODUCING HIGHER

STOCKBRIDGE SOLAR  FARM

Voltalia Ltd is proposing to develop the Higher Stockbridge Solar Park near Longburton, Sherborne. The site is approximately 3 miles to the south of Sherborne and 5 miles to the south east of Yeovil.

The planning application has now been submitted to
Dorset Council and assigned with planning application ref number WD/D/19/003181.

 

The Higher Stockbridge Solar Park will have a generating capacity of around 35 megawatts (MW). It will generate clean, renewable energy for approximately 10,605 homes a year. There will be electrical connection infrastructure and the point of connection to the electricity grid is an existing electrical network that runs through Higher Stockbridge Farm. Land will be provided for ecological mitigation and enhancement and with particular consideration to fauna, flora and bird species.

The scheme would displace circa 11,610 tonnes of carbon dioxide that may otherwise be generated through the burning of traditional fossil fuels.

 

ABOUT US

Founded in 2005, Voltalia is power producer and service provider in renewable electricity production from solar, wind, hydro and biomass energies. As an integrated company, Voltalia has developed a strong expertise throughout the value chain of a renewable project: project development, project financing, EPC and operation & maintenance. Voltalia is responsible for the installation of over 22 solar parks in the UK with a total capacity of over 196 MW.

 

OUR VISION AND OUR MISSION

Our mission is “to improve the global environment by promoting local development”. Our proposal at Higher Stockbridge forms part of our wider commitment of securing at least 100MW of subsidy free renewable energy for Dorset and the south west. We are also moving forward with other renewable energy schemes located near Yeovil and Blandford Forum. All our sites will contribute towards addressing national and local electricity needs by generating an affordable and renewable source of clean energy.

WHERE IS HIGHER

STOCKBRIDGE SOLAR PARK?

 

WHAT ARE THE BENEFITS OF THE
SOLAR PARK?

The main benefits of the development proposed are summarised below:

  • Subsidy free. Higher Stockbridge Solar Park will not require government subsidy. Solar is now one of the most cost effective sources of clean renewable electricity generation in the UK.

  • Local suppliers. Voltalia are committed to using local suppliers during construction and operation.

  • Assist with enabling Dorset to play its part in reducing greenhouse gas emissions in line with local, national and international targets.

  • Contribute towards the security of energy supply in Dorset through the provision of local, affordable renewable energy supply.

  • Biodiversity enhancement and landscaping proposed across the site

  • The Solar Park is sited on Grade 4 and subgrade 3b agricultural land which represents some of the poorest agricultural land in Dorset.

  • The continued agricultural use of the site can be achieved by allowing sheep to manage the grassland within the solar park.

 

RENEWABLE ENERGY DIRECTIVE

The UK Government has signed up to a Renewable Energy Directive of providing 15% of energy from renewables by 2020 (based on 2008 baseline). The 2017 output only reached 8.9% and there will have to be a much greater level of deployment over the next two years in order to meet the target. Furthermore, a quarter of the UK’s generating capacity is due to close by 2018 so a new mix of electricity generation is needed to keep the lights on. With the UK’s climate change ambitions being amongst the highest in Europe, we will need to significantly increase our renewable energy growth without jeopardising electricity supply, or increasing costs for consumers.

 

PLANNING APPLICATION DOCUMENTS

Dorset Council validated the planning application (LPA Ref WD/D/19/003181) on 23 December 2019.  The application submission may be viewed on the council’s website using the link
 

https://planning.dorset.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=DCAPR_140423

 

If you are after a specific approved planning application document, then please don’t hesitate to get in touch. Some of the key documents are available using the links below.

Site Location Plan

 

Layout Plan

 

Planting Plan

Design and Access Statement

 

Environmental Statement Non-Technical Summary

 

Planning Statement

 

REGISTER FOR UPDATES

If you live in post code DT9 and would like to be kept up to date with our proposals at Higher Stockbridge Farm, then please contact us on the details provided below.
Please provide your contact details if you wish to get a response from the project team.
Your contact details will not be disclosed to any other third parties.
stockbridgefarm@pegasusgroup.co.uk

Higher Stockbridge Solar Park,

C/O Pegasus Group,

First Floor,

South Wing,

Equinox North,

Great Park Road,

Almondsbury,

Bristol,

BS32 4QL

01454 625 945

Are you responding as:

P17-2603

  • Twitter Social Icon